Abeko ensured there were sufficient fully equipped service vehicles and technicians skilled to work on a wide variety of machines providing 24-7 coverage.
abeko-qatar (133)
Abeko built a fully equipped workshop with 10 full time engineers and 2 full time site/workshop supervisors and placed over 1,500,000 Euros worth of spare parts on site.
abeko-qatar (134)
abeko-qatar (135)
abeko-qatar (136)
abeko-qatar (137)
abeko-qatar (138)
abeko-qatar (139)
aeiral - august 2006
Arial view of the site prior to commencements of works.
aeiral - july 2008
Aerial view of extents of works by July 2008.
schematic-superimposed
Schematic of the works superimposed on aerial photograph.
schematic
Massive quantites of material were required to build the many kilometers of breakwaters and causeways.